There is a list of jobs that need doing in the ground pre-season. The list is available to view at the Club tonight Thursday and all day Saturday, it would be great if volunteers could choose one off the list and complete it at when they have the available time.
Regards Andy Lomas.
Andy: Can you post them on here?
Graham
Good idea GE then we can see what we can cope with if I can help I will try to.
GENERAL GROUND MAINTENANCE PRE SEASON 2013
Fascias of turnstiles being replaced by Tim Atherton, assistance required to prepare and repaint lengths not being replaced.
Clean and paint where necessary Home Dressing Room
Clean and paint where necessary Away Dressing Room
Stand needs cleaning small pan and brush, pressure washed if required.
Flooring in players corridor is being replaced walls will require “touching up”
Players tunnel from building onto pitch needs painting.
All terracing needs brushing and moss removed.
The far side and Lostock end need at least the flaking paint to be removed off the fencing. If any time available painted !
Area in front of disused Tea Hut in stand needs to be cleared.
Renew or remove broken tiles in main Tea Hut.
General litter picking outside of ground.
Perimeter of pitch needs edging.
Lots more :ohmy:
I have started cleaning .Finished the main stand today and hope to power wash it on Friday. Will continue to work around the stadium. Any help appreciated.